Things you ll need nails 3 4 inch osb or plywood sheets 4 x 8 silicone caulk circular saw jig saw subfloor adhesive.
Building basement bathroom raised floor.
Building basement bathroom is different from building the one you have in the ground floor.
The raised drainage platform was a necessity because the main drain the big black one on the right in the first picture did not have a place where we could connect the bathroom drainage to the rest of the house s drainage.
The bathroom floor was previously raised about 10 extra inches relative to the rest of the floor for drain pipes that were run above the slab.
There are some crucial points that you need to take into your consideration before building one as basement is located underneath the ground and for this reason it should be treated with extra care.
Plumbers labor rates vary a lot by region but a basement bathroom cost would run between 1 200 to 2 000 for a pro job similar to the one shown here.
You supply the labor and the basement bathroom ideas.
Now i ve cut up the concrete floor had a plumber run pipes re filled with bagged concrete and leveled the cutout with self leveling cement.
Provide a flat level surface for the finish flooring.
There was no headroom.
A contractor wants to build a raised floor for my bathroom basement that he is building for me instead of breaking the concrete.
Essential points to consider for basement bathroom.
The materials for the dwv system shown here cost about 250.
Building on the floor.
Provide a thermal break i e insulation.
In this post we ll explore the 5 key elements of your basement bathroom design.
Keep moisture at bay.
This article will supply the know how.
Is this a viable and safe.
Be able to dry out in the event of flooding.
The plumbing would be underneath the floor.
You ll need help with holding the wood together as you start to secure it and you ll need someone to help lift the wall into place.
If your basement floor is not level which most basement floors aren t building on the.
So instead of breaking concrete we built the floor up to accommodate the plumbing.
Unlike above grade sub flooring basement sub floor has to do all of the usual things and more.
Plus i will tell you the 3 things.
You ll be working on finishing your basement framing electrical and so on then one day you ll start on your bathroom and you won t come out for like a month and half.